ResLCM® pill can be formulated to have stable setting time in a wide range of formation temperature to eliminate operating risk of thermosetting resins.

ResLCM® is significantly more economical to be used as LCM than any other resins on the market.

 

ResLCM® is specially designed to be used as a Lost Circulation Material. It can be used to cure any types of Loss, specially beneficial for Severe Loss or Total Loss. Thanks to reworking from natural amber, ResLCM® is a nature-friendly amber product which is very safe to use.

ResLCM® has stable setting time in a wide range of formation temperature. This proprietary property helps eliminate the risks of premature or late setting of other thermosetting resins in lost circulation treatment.

ResLCM® can be designed as a gel or as a hard solid as cement to fit best to your formation characteristic.

ResLCM® can save you from days to weeks of rig time. It gives you a completely different approach compared to traditional LCM products. The lost circulation can be killed in a very short time after ResLCM® arrives.

ResLCM® is significantly more economical to be used as LCM than any other resins on the market.

Features:

. Nature-friendly, can be transported as normal goods
. Stable setting time vs. temperature variation
. Controllable setting time
. Right angle setting
. Adjustable density & rheology
. Contamination Resistance
. Easy pumping through drilling BHA, drilling bits and downhole tools
. Easy to drill through after setting
. Seal off loss zone permanently

Do you have lost circulation problem ?
Talk to our experts and get quick, effective & economical solution.

DRILLING & LOST CIRCULATION

ResLCM® can save you from days to weeks of rig time. It gives you a completely different approach compared to traditional LCM products. 

The lost circulation can be killed in a very short time after ResLCM® arrives. ResLCM® is easy to prepare, can be adjusted to any densities from 0.8 to 2.8 SG, and is compatible with most of drilling fluids. 

ResLCM® is like a thin oil, can be pumped into the loss zone through drilling BHA, drilling bit and downhole tools. This means you don’t need to pull out of hole, run in to treat the loss, pull out of hole then run in again with the new drilling BHA. Drilling operation can be resumed as soon as the resin is set. 

Kick Off Plug

Are you interested in saving rig time on kick-off plugs? 

With ResLCM®, a nature-friendly resin-based kick off plug from ExperWELL®, WOC time can be significantly reduced compared to cement or eliminated, and transition zone reduced to give more predictable top of plug.